In short: Ask every shortlisted firm the same questions, in writing. Cover similar workplaces, who files landlord and authority papers, what is excluded, how variations are priced, and who is on site. Licence and registry checks stay on the existing how-to-choose guide.
The five-step note on licences, fees and engagement clauses is how to choose a commercial office renovation contractor. This page does not reprint that fee table. Ask these questions in writing, to every firm, on the same day.
Fifteen questions
1. Can we see a completed office or shop of a similar size and building type?
Why: a mood board of overseas work does not show how this building’s landlord behaves. A useful answer is photographs plus a way to verify the job, such as the building type or an address you can check. A useful answer is not a promise of a client logo.
2. Who is the qualified person, and are submissions in your fee?
Why: BCA and SCDF papers are not a courtesy. A useful answer names the person and says whether their fee is inside the number. The map is the permits checklist.
3. Have you worked to this landlord’s, MCST’s, HDB’s or JTC’s guide?
Why: the paths differ. A useful answer describes the last job of that type, not “we do all buildings”. HDB, JTC and private guides are separate lists.
4. What is included and excluded, line by line?
Why: furniture, IT, sprinklers, after-hours labour and hoarding are the lines that move the total. Use the exclusions list. A useful answer is a list, not “standard fit-out”.
5. Who coordinates fire, data and air-conditioning?
Why: “our partners” is not a scope. A useful answer names the role that coordinates them and whether they are in the contract.
6. What programme will you commit to, and what is on the critical path?
Why: brochure averages are not a date. A useful answer is a sequence tied to your access date, with the submissions marked. The timeline explains why there is no standard number of weeks.
7. How are variations instructed and priced?
Why: a verbal change becomes a dispute. A useful answer says who may instruct, and that the price or the rate is agreed before the work. See the contract checklist.
8. What insurance do you carry, and does it meet this landlord’s schedule?
Why: buildings set their own limits. A useful answer is the certificate, compared with the landlord’s schedule. Do not invent a minimum sum.
9. Are you on BCA’s Contractors Registration System, and for which workhead and grade?
Why: you need the right fact. BCA’s CRS page, last updated 10 September 2026, says registration is required to hire construction S Pass or Work Permit holders from 1 June 2025, and to participate in public-sector construction tenders. It is not a licence for every private fit-out. CR06, in the May 2025 specific registration requirements, is interior design, planning and decoration, including ceiling panels, partitions, built-in fitments, raised floors, plastering and tiling. The CR06 register is a directory, not a recommendation.
10. What workplace-safety arrangements will you use?
Why: risk assessments and work-at-height controls are safety duties. bizSAFE is a WSH Council programme that landlords often require. It is not itself a fit-out licence. A useful answer maps the documents to this building’s rules.
11. Who is the site supervisor, and will they be there?
Why: HDB and JTC sites in particular fail when nobody is present. A useful answer names the role and the hours they will be on site.
12. How do you handle noisy work in an occupied building?
Why: the building’s hours decide the programme. A useful answer quotes those hours back to you.
13. What does handover include?
Why: as-built drawings, warranties, and fire documents if any, are what you will need later. A useful answer lists them.
14. Can reinstatement be priced now, or only later?
Why: the lease will ask for the unit back. A useful answer says when that price will be given, against the lease wording. See reinstatement mistakes.
15. Who do we call, and what is the payment schedule, including any retention?
Why: a single phone number and milestones tied to progress are easier to manage than “the office”. Do not prescribe a deposit percentage. There is no official one in this pack.
16. Are CaseTrust marks relevant to this commercial contract?
Why: CaseTrust’s renovation accreditation, checked 12 November 2026, is written for homeowners and home renovation, including a workmanship warranty described for homeowners. It is not the way to vet a commercial office fit-out. A useful answer does not treat that logo as a commercial licence.
WhatsApp +65 9071 3976 (chat).
Frequently asked questions
Is this the same as the how-to-choose guide?
No. That guide is the five-step buyer’s note, including how CRS works and what to put in an engagement. This page is the interview. Use both. Do not treat a polished answer as a ranked vendor.
Should every firm be on BCA CRS?
Not as a universal private-work licence. BCA’s CRS page, last updated 10 September 2026, says that since 1 June 2025 firms that wish to hire construction S Pass or Work Permit holders must register, and that registration is required for public-sector construction tenders. CR06 is the interior decoration and finishing workhead described in BCA’s May 2025 requirements.
What if two firms answer differently?
That is the point of asking the same questions. Differences in exclusions and in who files submissions are more useful than differences in adjectives.
