In short: Singapore's Energy Efficiency Grant (EEG) offers up to 70% support for SMEs and 30% for non-SMEs (capped at S$30,000 under the Base Tier for pre-approved equipment, and up to S$350,000 under the Advanced Tier) across Manufacturing, Food Services, Food Manufacturing, Retail, Construction, Maritime and Data Centres. Estimate your grant and monthly electricity savings with our EEG grant calculator.
The Energy Efficiency Grant (EEG) is Singapore’s primary grant for businesses upgrading to energy-efficient equipment to lower electricity and gas bills. Jointly administered by Enterprise Singapore, the National Environment Agency (NEA) and the Building and Construction Authority (BCA), the scheme is especially valuable in late 2026 as global oil volatility and regional gas supply tightness keep commercial utility tariffs elevated.
How we vet, what we don't check, how we make money and when we stop introducing a provider →
Base Tier vs Advanced Tier: how EEG support works
| Feature | EEG Base Tier | EEG Advanced Tier |
|---|---|---|
| Support level | Up to 70% for SMEs Up to 30% for Non-SMEs | Assessed on lifetime carbon abatement & qualifying cost |
| Grant cap | S$30,000 per company per year | Up to S$350,000 per company |
| Equipment selection | Must be selected from the pre-approved energy-efficient equipment list on the Business Grants Portal (BGP) | Custom or multi-equipment projects that need not be on the pre-approved list, provided they meet energy-audit and carbon-abatement thresholds |
| Local shareholding rule | At least 30% Singapore citizen or PR shareholding | Can be open to both local and qualifying foreign-owned industrial facilities meeting carbon-abatement criteria |
Run your equipment quote through our Energy Efficiency Grant (EEG) calculator to see your net cost and utility payback period.
Eligible equipment categories by sector
- Commercial air-conditioning (ACMV) and chillers: NEA 4-tick / 5-tick inverter air-conditioners and high-efficiency chiller plant components.
- Commercial refrigeration & cold-chain: High-efficiency chillers, freezers and display cabinets for F&B outlets, supermarkets and food manufacturers.
- LED lighting and controls: High-efficacy commercial/industrial LED luminaires and occupancy sensors.
- Cooking, water heating and boilers: Heat-pump water heaters, induction commercial wok/kitchen equipment and high-efficiency industrial boilers.
- Industrial motors and compressed air: IE4 super-premium efficiency motors, variable speed drives (VSDs) and energy-efficient air compressors.
How to apply and compare M&E or fit-out contractors
- Obtain itemised quotes before committing: Request quotes specifying the exact NEA/BCA model number on the BGP pre-approved list. Do not sign the quotation or pay a deposit before submitting on BGP.
- Combine with commercial renovation or reinstatement: If you are already fitting out a new restaurant, retail unit, warehouse or office, coordinate the EEG equipment purchase with your commercial renovation contractor so M&E wiring and piping are done once.
- Pair with back-office automation: Offset remaining utility inflation by automating manual invoice entry and customer service with workflow automation and EDGE Grant support.
Frequently asked questions
Which sectors are eligible for the Energy Efficiency Grant (EEG) in 2026?
The expanded Energy Efficiency Grant (EEG) covers Singapore-registered businesses in Manufacturing, Food Services (F&B), Food Manufacturing, Retail, Data Centres, Construction, Maritime and qualifying Commercial Buildings.
How much does the EEG Base Tier vs Advanced Tier fund?
Under the Base Tier, SMEs receive up to 70% support and non-SMEs receive up to 30% support for pre-approved energy-efficient equipment, capped at S$30,000 per company per year. Under the Advanced Tier, companies undertaking larger retrofits with higher carbon abatement can receive up to S$350,000.
Does the EEG remain available after PSG closed on 29 September 2026?
Yes. While general software and equipment under PSG moved into the EDGE Grant on 30 September 2026, the Energy Efficiency Grant (EEG) continues as Singapore’s dedicated grant for energy-efficient equipment and industrial decarbonisation.
Can I install the equipment before my EEG application is submitted?
No. Like all Business Grants Portal schemes, you must submit your EEG application before signing a purchase contract, starting installation or making any payment or deposit.
