In short: The expensive F&B mistakes happen before the first tile. Signing a lease for a use that is not approved, drawing a kitchen that misses SFA’s design rules, or leaving grease traps and exhaust until the end. SFA says get planning permission before investing in renovation or equipment. Checked 12 Nov 2026.
The matching page for restaurants is office renovation for F&B. This list is the mistakes that page does not have room for. No contractor is named.
Ten mistakes
1. Signing the tenancy before the use is allowed
SFA’s food shop pre-licensing checklist, checked 12 November 2026, tells applicants to obtain relevant planning permission before signing a tenancy and investing in renovation or equipment. Its examples include a BCA temporary occupation permit, URA change of use, and HDB usage approval.
GoBusiness’s food shop licence page, checked the same day, says applicants are required to obtain in-principle approval before renovation works can commence. It also says successful applicants are notified within 7 working days by email. That is a notification window, not a promise that your file is complete.
URA’s change-of-use fee and timing are on the permits checklist. URA’s restaurant criteria, last updated 23 June 2026 and re-opened 12 November 2026, say planning permission is not required for a new restaurant in shopping centres and commercial buildings. They also describe locations where a new restaurant is unlikely to be approved, and they set out considerations URA uses when asking whether a restaurant has become a bar or pub, including whether meals are available and whether the premises are presented as a place for drinking. Read the page for the address you have. Do not invent an authorisation for a shophouse.
2. Ignoring the fire-safety change of use
Shop to eating establishment is SCDF’s own example of a change that can require plan approval. That test is the fire-safety list. A kitchen layout can move compartments and suppression. Do not call it a refresh and skip the qualified person.
3. Drawing a kitchen below SFA’s published minima
The checklist states a minimum kitchen area of 10 m² excluding the servery, and 16 m² if the operation involves food catering. Measure the kitchen, not the whole unit.
4. Putting a grease trap or a soil pipe in a food room
SFA says there shall be no manhole, inspection chamber, waste sump, screen chamber, grease trap, or overhead sanitary, waste or drain pipes in areas where food is prepared, cooked, stored or served. Cleaning access for a trap is a separate job: kitchen exhaust and grease-trap cleaning. The trap still cannot sit in the prep room because a cleaner needs it there.
5. Floors and walls that will not clean to the standard
The checklist requires floor traps and a graded kitchen floor, a coved wall-to-floor edge, and prep and servery walls lined with glazed tiles or other suitable impervious material to not less than 1.5 m.
6. Too few sinks, or one tap doing two jobs
At least one sink in the preparation area. At least one wash-hand basin with soap for kitchen workers. If a double-bowl sink dedicates one bowl to hand-washing, the checklist calls for two separate taps. Where food is eaten with hands and there is no toilet, read the extra basin line on the checklist rather than guessing.
7. Exhaust that cannot leave the building
Cooking fumes are to be extracted immediately, treated with an air-cleaning system, and exhausted outdoors, at or above the roof where practical, facing away and screened from immediate neighbours. The checklist also requires sufficient make-up air and negative pressure in the kitchen when the hood is on, and ducts of non-combustible, smooth, cleanable material with inspection openings. In an HDB shop, the December 2025 guide adds 500 mm clearance from unprotected combustible materials. See the HDB checklist.
8. A layout plan the licence file cannot use
SFA wants a layout in scaled metric units, with a stated scale, kitchen equipment and infrastructure including exhausts, sinks and wash basins, and the boundary of the refreshment area.
9. Forgetting the building type’s house rules
Shophouse food shops: a barrier, described as a door kerb, at the rear entrance so sullage does not flow to the drain. HDB hours and debris rules are the HDB checklist. JTC hours are the JTC steps. A mall cafe follows that mall’s guide, not HDB’s clock. Retail units that are not food shops use the retail checklist.
10. Treating in-principle approval as a licence to open
In-principle approval is permission to start renovation on the GoBusiness page, not the licence to trade. After pre-licensing requirements are met, the same page says you must pay within 28 days of the payment notification or the application lapses. Staff food-safety courses are a licensing item on SFA’s materials. They are not a tile specification, and they are still required.
Illustrative only. A cafe drawn with an 8 m² kitchen and a grease trap in the prep room fails two checklist lines before anyone prices joinery. This page does not invent the cost of putting that right.
Financing, if you need it, stays on the F&B business loan page, with that page’s disclaimers. FYAdvisers is not a lender.
WhatsApp +65 9071 3976 (chat).
Frequently asked questions
Can I renovate first and apply for the food shop licence later?
SFA’s pre-licensing checklist says obtain planning permission before signing a tenancy and investing in renovation or equipment. GoBusiness, checked 12 November 2026, also says applicants must obtain in-principle approval before renovation works can commence. The finished premises still have to meet the design checklist at inspection.
Does every restaurant need URA permission?
Not always. URA’s restaurant criteria, re-opened 12 November 2026, say planning permission is not required for a new restaurant in shopping centres and commercial buildings. Shophouse applications are assessed individually, and some areas are unlikely to be approved. Read the live page for your address.
Are these rules the same for a factory canteen?
SFA’s food-shop checklist has extra lines for stalls, catering and other operations. Use the checklist for the licence you are actually applying for. Do not assume a retail cafe and a factory canteen are the same file.