In short: Outdoor signs need a BCA licence unless your signboards add up to 5 square metres or less. BCA takes about 7 working days with complete documents, plus about two weeks if URA reviews it. A signboard licence costs S$50 a year up to 15 square metres, and advertisement licences start at S$20 a year.
Singapore regulates outdoor signs through BCA’s Advertisement Licensing System (ALS), with URA’s signage guidelines applied depending on where the building is. In practice, your sign maker usually prepares the drawings and submits the application, but you, the landlord and the building management all have to sign off.
Everything below is from BCA’s outdoor advertising sign and signboard licence page and its supporting information, checked in October 2026.
When you need a licence
You need a licence to display an outdoor advertising sign or signboard. BCA treats a space as outdoor if it is roofed but not fully enclosed on all sides, and it is used by pedestrians or open to the public. A five-foot way or an open corridor is outdoor. The inside of an air-conditioned mall or your own office is not.
- Signboard: relates to the premises it is fixed to, such as your business name, and carries no other brand name.
- Advertising sign: promotes goods, products, brands, services or events.
What is exempt
- A single signboard, or a series of related signboards, with a total area of 5 m² or less. Each business premises gets this aggregate 5 m² exemption once, claimed with a declaration form during the online consultation.
- Signboards of religious bodies, government-aided schools, and charity-run hospitals, clinics, homes and hospices.
- Signs on stalls in hawker centres, food centres and markets.
- Signs in underpasses, tunnels and MRT stations.
What is not allowed
- Signs lit by flickering, flashing or running lights, except on certain streets in Orchard Road, Bras Basah and Bugis, and Chinatown.
- Advertising on free-standing structures promoting brands, products or services.
- Advertising above roofs or roof parapets.
- Advertising on public infrastructure, such as MRT entrances, viaduct columns and kiosks.
- Advertising on residential buildings or the residential part of mixed-use buildings.
- Advertising near airports and airbases, over or within public streets, and in water catchments, parks, nature reserves, coastlines and vacant land.
Size and position rules
Under the Building Control (Outdoor Advertising) Regulations:
| Situation | Rule |
|---|---|
| Sign over a footpath or verandah-way | At least 2.5 m above it |
| Sign projecting over a street above a roadside drain | At least 2.5 m above the drain cover |
| Sign 3.75 m to 5 m above the street | Projects no more than 60 cm |
| Sign 5 m or more above the street | Projects no more than 1.5 m |
URA has three sets of outdoor signage guidelines: for the Central Area, outside the Central Area, and for conservation buildings, plus separate rules for event signage in the Central Area.
Documents you submit
- Visuals of the sign, showing where the licence number will go.
- An elevation plan of the facade with the sign’s dimensions.
- A sectional view showing how it is fixed and what it is made of.
- A layout plan and a site plan.
- The 5 m² declaration form and photos of all existing signboards, if claiming the exemption.
- Consent from the land or building owner.
- Clearances from agencies such as LTA or SLA, where relevant.
Who endorses the documents:
- MCST-managed buildings (malls, strata offices): the MCST, plus the lot owner and landlord if you are a tenant.
- Town Council commercial units (HDB shops): the Town Council, plus the unit owner and landlord if you are a tenant.
- Other properties: the owner, and the landlord if you are a tenant.
Steps and timing
- Log in to the ALS with Singpass and use the online consultation to check the proposal.
- Submit the proposal with the documents above.
- Get a Permit To Use first, if your sign needs one (see below).
- Pay the licence fee. BCA emails the licence once payment is verified.
BCA typically takes 7 working days to assess a complete application, and about two weeks more if URA has to evaluate it. You cannot change the proposal during the formal application.
Permit To Use and engineers
Under the Building Control (Temporary Building) Regulations 2018, you need a Permit To Use before the licence if:
- the sign exceeds 10 m² and is supported by an advertising structure, or
- the advertising structure exceeds 10 m², or its highest point is 4 m or more above the surface it stands on.
A Professional Engineer applies for it through CORENET, and it must cover the whole display period. The fee is S$200 per structure, or S$200 for every 100 m² where there is measurable floor area. Banners need PE certification if they are over 10 m² with bars or rods, or over 30 m².
Licence fees per year
| Licence | Size | Fee |
|---|---|---|
| Signboard | Up to 15 m² | S$50 per licence |
| Signboard | Above 15 m² | S$20 per m² (or part) above 5 m² |
| Advertisement, directional or free-standing signboard | Up to 1 m² | S$20 per sign |
| Above 1 m² to 5 m² | S$90 per sign | |
| Above 5 m² to 10 m² | S$140 per sign | |
| Above 10 m² | S$20 per m² (or part) per sign | |
| Animated billboard | Up to 10 m² | S$225 per sign |
| Above 10 m² | S$30 per m² (or part) per sign | |
| Skysign or balloon sign | Display area | S$40 per m² (or part) per sign |
The minimum chargeable period is one month, with a minimum fee of S$20, and part months round up. GIRO is required for annual auto-renewal; without it the licence lapses and you have to apply again. Licences cannot be transferred to a new owner.
Use our signage cost and BCA licence fee calculator to work out the fee for your sign.
Practical tips
- Check before you sign the lease. Ask the landlord what sign sizes and positions the building allows.
- Use the 5 m² exemption well. A modest signboard within 5 m² avoids the licence altogether, but it covers all your signboards together.
- Leave time. One Singapore sign maker suggests ordering eight weeks before installation, and 12 to 14 weeks for a conserved shophouse.
- Ask who submits. Many sign makers handle the ALS application for you. Advert & Signs lists S$380 to S$800 for handling the BCA licence and application.
Get matched
A concierge introduces one to five Singapore sign makers who quote for the sign and the licence application. Free for businesses.
Frequently asked questions
Do I need a licence for my shop sign?
If the sign is outdoors, usually yes. BCA counts a space as outdoor if it is roofed but not fully enclosed on all sides and the public can walk through it, such as a five-foot way or an open corridor. A signboard, or a series of related signboards, with a total area of 5 square metres or less is exempt, and each business premises can claim this exemption once.
How long does BCA take to approve a sign?
BCA says it typically takes 7 working days to assess an application when all the required documents are provided. If the proposal needs evaluation by URA, it may take about two weeks more. No changes are allowed during the formal application stage.
How much is a BCA signage licence?
A signboard licence costs S$50 a year for up to 15 square metres, and S$20 per square metre above 5 square metres for larger ones. Advertisement, directional and free-standing signboard licences cost S$20 a year up to 1 square metre, S$90 for 1 to 5, S$140 for 5 to 10, and S$20 per square metre above 10. The minimum fee is S$20 and the minimum period one month.
What is the difference between a signboard and an advertising sign?
A signboard relates to the premises it is fixed to, such as your business name and logo, and carries no other brand. An advertising sign promotes goods, products, brands, services or events. A shop sign showing a supplier's brand, for example a beer logo on an F&B signboard, makes it an advertising sign.
When does a sign need a Professional Engineer?
A Permit To Use, applied for by a Professional Engineer through CORENET, is needed when a sign over 10 square metres is supported by an advertising structure, or when the structure is over 10 square metres or its highest point is 4 metres or more above the surface it stands on. Banners need PE certification if they are over 10 square metres with bars or rods, or over 30 square metres.
