Provider directory
BCA-registered TR05 Pre-cast Installation contractors
TR05 Pre-cast Installation is a BCA workhead in the trade heads (TR) group of the Contractors Registration System. Firms listed here have been registered by BCA in this workhead at the grade shown.
In short: 12 firms hold TR05 registration in BCA's listing dated 12 Jan 2026, all at Single Grade. Confirm any firm's current status on BCA's e-Directory before you award work.

Firms by grade
| Grade | Firms |
|---|---|
| Single Grade | 12 |
All TR05 firms
| Company | UEN | Expiry | Postal district |
|---|---|---|---|
| Apez Construction Pte. Ltd. | 201129813M | 1 Mar 2026 | D22 Jurong, Tuas |
| Crec Construction Pte. Ltd. | 200618783E | 1 Jul 2028 | D20 Bishan, Ang Mo Kio |
| Dengda Construction Pte Ltd | 201112568N | 1 Apr 2027 | D14 Geylang, Eunos |
| E C Builders Pte. Ltd. | 201022368Z | 1 Apr 2026 | D22 Jurong, Tuas |
| FAR Eastern GRC Pte Ltd | 201704918E | 1 Apr 2028 | D03 Queenstown, Tiong Bahru |
| Kenston Construction Pte Ltd | 199004736N | 1 Jul 2026 | D26 Upper Thomson, Springleaf |
| SIN Heng Heavy Machinery Limited | 198101305R | 1 Jun 2028 | D22 Jurong, Tuas |
| South Forward Construction Pte. Ltd. | 201023371M | 1 Oct 2028 | D14 Geylang, Eunos |
| TSS Construction Pte Ltd | 199102711E | 1 Aug 2027 | D16 Bedok, Upper East Coast |
| XIN Yang Builder Pte Ltd | 201810733D | 1 Feb 2027 | D15 Katong, Joo Chiat |
| YIN Cheng Construction Pte. Ltd. | 201914435K | 1 Nov 2028 | D26 Upper Thomson, Springleaf |
| Yinfu Construction Pte. Ltd. | 201801326D | 1 Feb 2027 | D26 Upper Thomson, Springleaf |
Check any firm on BCA's e-Directory by name or UEN. Need to register or upgrade in TR05? See BCA registration consultants, or browse all workheads.
Source: Building and Construction Authority (BCA), Listing of Registered Contractors on data.gov.sg, last updated on 12 Jan 2026 (24,014 registrations). Workhead names are from BCA's e-Directory. Expiry dates are as published on that date, so a registration may since have lapsed, been renewed or changed grade. Postal districts are derived from each firm's postal code; we do not show addresses or phone numbers.
Frequently asked questions
What is the TR05 Pre-cast Installation workhead?
TR05 Pre-cast Installation is a BCA workhead in the trade heads (TR) group of the Contractors Registration System. Firms listed here have been registered by BCA in this workhead at the grade shown.
How many firms are registered in TR05?
BCA's listing dated 12 Jan 2026 has 12 firms registered in TR05 at Single Grade.
How do I check a TR05 contractor's registration?
Search the firm's name or UEN on BCA's e-Directory (www.bca.gov.sg/eBACS/bca_directory), which shows current registration status and grade. This page is a snapshot, so a registration may have changed since 12 Jan 2026.
How does a firm get registered in TR05?
Firms apply to BCA through eBACS and must meet the requirements BCA sets for the workhead and grade. FYAdvisers can introduce one to five BCA registration consultants who help with workhead choice, documents and upgrades. It is free for businesses.
Listings are reproduced from BCA's published register and are not paid placements. Inclusion is not an endorsement or a recommendation by FYAdvisers, and we have not checked any firm's work. Always verify a firm's current registration on BCA's e-Directory before you rely on it. Is this your company? Tell us about your firm.
Which type of provider fits BCA-registered TR05 Pre-cast Installation contractors?
Most Singapore buyers choose between a few types of firm rather than between brands. Use these cards to decide which type to shortlist, then ask a concierge for introductions. They describe typical patterns, not any named firm.
Large main contractor
Big fit-outs, multi-trade or regulated works
- Handles permits, safety and many trades
- Higher BCA grades and tendering limits
- Premium pricing and layers of subcontracting
- Less attention for small jobs
Mid-size specialist
Most SME offices, shops and facilities
- Specialist crew with project management
- Competitive quotes
- May subcontract outside its core trade
- Check workload before booking
Small owner-run firm
Small jobs, repairs, quick turnarounds
- Owner on site, lowest overheads
- Flexible scheduling
- Limited capacity and warranty backing
- Verify licences and insurance
Quick comparison by firm type
| Typical strength | Large main contractor | Mid-size specialist | Small owner-run firm |
|---|---|---|---|
| Partner/senior hands-on | ✖ | ✅ | ✅ |
| Broad specialist bench | ✅ | ✅ | ✖ |
| Lowest typical fees | ✖ | ✖ | ✅ |
| Cover for leave and peaks | ✅ | ✅ | ✖ |
| Fast to start | ✖ | ✅ | ✅ |
General patterns only. Individual firms vary, so confirm scope, team and fees in writing.
TR05 Pre-cast Installation firms: what the register shows
Of the 12 firms in this TR05 Pre-cast Installation listing, 3 (25%) have a registration expiry within 12 months of BCA's listing date of 12 Jan 2026, so check renewal before awarding a long contract. D22 Jurong, Tuas has the most firms (3), followed by D26 Upper Thomson, Springleaf (3) and D14 Geylang, Eunos (2).
| Postal district | Firms | Share |
|---|---|---|
| D22 Jurong, Tuas | 3 | 25% |
| D26 Upper Thomson, Springleaf | 3 | 25% |
| D14 Geylang, Eunos | 2 | 17% |
| D20 Bishan, Ang Mo Kio | 1 | 8% |
| D03 Queenstown, Tiong Bahru | 1 | 8% |
| D16 Bedok, Upper East Coast | 1 | 8% |
| D15 Katong, Joo Chiat | 1 | 8% |
Computed by FYAdvisers from BCA's register rows on this page.
Registrations expiring within 12 months
- Apez Construction Pte. Ltd., grade , expires 1 Mar 2026
- E C Builders Pte. Ltd., grade , expires 1 Apr 2026
- Kenston Construction Pte Ltd, grade , expires 1 Jul 2026
What to check before hiring a TR05 Pre-cast Installation contractor
- Confirm the firm's TR05 Pre-cast Installation grade and expiry on BCA's Directory of Registered Contractors on the day you award.
- Make sure the grade's tendering limit covers your contract value for public sector work.
- Ask for bizSAFE certification and the WSH documents MOM expects for the site.
- Check the UEN on ACRA BizFile+ and that it matches the BCA record.
- Get the scope, defects liability period and retention sum in the written contract.
Official rules and registers
- BCA Directory of Registered Contractors
- BCA Contractors Registration System
- MOM Workplace Safety and Health
- ACRA BizFile+ (UEN and live status)
Related pages
More questions
How many TR05 Pre-cast Installation registrations expire within a year?
3 of 12 firms in BCA's listing dated 12 Jan 2026 have an expiry within 12 months of that date.
Where are most TR05 Pre-cast Installation contractors based?
D22 Jurong, Tuas, with 3 of 12 firms in this listing.