# 15 questions to ask a commercial interior designer or fit-out firm

> Fifteen written questions for a commercial interior designer or fit-out firm: submissions, exclusions, variations and handover. No vendor list.

Source: https://www.fyadvisers.com/blog/questions-to-ask-commercial-interior-designer-singapore/  
Author: Fiona Wang, FYAdvisers  
Published: 2026-11-12  
Last updated: 2026-11-12

The five-step note on licences, fees and engagement clauses is [how to choose a commercial office renovation contractor](/blog/how-to-choose-commercial-office-renovation-contractor-singapore/). This page does not reprint that fee table. Ask these questions in writing, to every firm, on the same day.

## Fifteen questions

### 1. Can we see a completed office or shop of a similar size and building type?

Why: a mood board of overseas work does not show how this building’s landlord behaves. A useful answer is photographs plus a way to verify the job, such as the building type or an address you can check. A useful answer is not a promise of a client logo.

### 2. Who is the qualified person, and are submissions in your fee?

Why: BCA and SCDF papers are not a courtesy. A useful answer names the person and says whether their fee is inside the number. The map is the [permits checklist](/blog/commercial-fit-out-permits-approvals-singapore/).

### 3. Have you worked to this landlord’s, MCST’s, HDB’s or JTC’s guide?

Why: the paths differ. A useful answer describes the last job of that type, not “we do all buildings”. HDB, JTC and private guides are separate lists.

### 4. What is included and excluded, line by line?

Why: furniture, IT, sprinklers, after-hours labour and hoarding are the lines that move the total. Use the [exclusions list](/blog/items-often-missing-office-fit-out-quotes-singapore/). A useful answer is a list, not “standard fit-out”.

### 5. Who coordinates fire, data and air-conditioning?

Why: “our partners” is not a scope. A useful answer names the role that coordinates them and whether they are in the contract.

### 6. What programme will you commit to, and what is on the critical path?

Why: brochure averages are not a date. A useful answer is a sequence tied to your access date, with the submissions marked. The [timeline](/blog/office-fit-out-timeline-steps-singapore/) explains why there is no standard number of weeks.

### 7. How are variations instructed and priced?

Why: a verbal change becomes a dispute. A useful answer says who may instruct, and that the price or the rate is agreed before the work. See the [contract checklist](/blog/office-fit-out-contract-payment-variations-singapore/).

### 8. What insurance do you carry, and does it meet this landlord’s schedule?

Why: buildings set their own limits. A useful answer is the certificate, compared with the landlord’s schedule. Do not invent a minimum sum.

### 9. Are you on BCA’s Contractors Registration System, and for which workhead and grade?

Why: you need the right fact. [BCA’s CRS page](https://www1.bca.gov.sg/growth-and-transformation/procurement/registration-of-built-environment-firms/contractors-registration-system-crs/), last updated 10 September 2026, says registration is required to hire construction S Pass or Work Permit holders from 1 June 2025, and to participate in public-sector construction tenders. It is not a licence for every private fit-out. [CR06](https://file.go.gov.sg/bca-crs-srr-cr.pdf), in the May 2025 specific registration requirements, is interior design, planning and decoration, including ceiling panels, partitions, built-in fitments, raised floors, plastering and tiling. The [CR06 register](/contractors/cr06-interior-decoration-and-finishing-works/) is a directory, not a recommendation.

### 10. What workplace-safety arrangements will you use?

Why: risk assessments and work-at-height controls are safety duties. bizSAFE is a WSH Council programme that landlords often require. It is not itself a fit-out licence. A useful answer maps the documents to this building’s rules.

### 11. Who is the site supervisor, and will they be there?

Why: HDB and JTC sites in particular fail when nobody is present. A useful answer names the role and the hours they will be on site.

### 12. How do you handle noisy work in an occupied building?

Why: the building’s hours decide the programme. A useful answer quotes those hours back to you.

### 13. What does handover include?

Why: as-built drawings, warranties, and fire documents if any, are what you will need later. A useful answer lists them.

### 14. Can reinstatement be priced now, or only later?

Why: the lease will ask for the unit back. A useful answer says when that price will be given, against the lease wording. See [reinstatement mistakes](/blog/office-reinstatement-mistakes-lease-end-singapore/).

### 15. Who do we call, and what is the payment schedule, including any retention?

Why: a single phone number and milestones tied to progress are easier to manage than “the office”. Do not prescribe a deposit percentage. There is no official one in this pack.

### 16. Are CaseTrust marks relevant to this commercial contract?

Why: [CaseTrust’s renovation accreditation](https://www.case.org.sg/casetrust/casetrust-accreditation-for-renovation-businesses/), checked 12 November 2026, is written for homeowners and home renovation, including a workmanship warranty described for homeowners. It is not the way to vet a commercial office fit-out. A useful answer does not treat that logo as a commercial licence.

WhatsApp +65 9071 3976 ([chat](https://wa.me/6590713976)).

## Frequently asked questions

### Is this the same as the how-to-choose guide?

No. That guide is the five-step buyer’s note, including how CRS works and what to put in an engagement. This page is the interview. Use both. Do not treat a polished answer as a ranked vendor.

### Should every firm be on BCA CRS?

Not as a universal private-work licence. BCA’s CRS page, last updated 10 September 2026, says that since 1 June 2025 firms that wish to hire construction S Pass or Work Permit holders must register, and that registration is required for public-sector construction tenders. CR06 is the interior decoration and finishing workhead described in BCA’s May 2025 requirements.

### What if two firms answer differently?

That is the point of asking the same questions. Differences in exclusions and in who files submissions are more useful than differences in adjectives.